在搭設木工加工棚時(shí)要了解到施工要點(diǎn)

來(lái)源:http://www.gyjywl.com/   發(fā)布時(shí)間:2022-12-19

由于木工加工棚的施工質(zhì)量會(huì )對后期使用的產(chǎn)生較大影響,因此,在搭設木工加工棚的過(guò)程中應注意以下施工要點(diǎn)。
Since the construction quality of woodworking shed will have a great impact on the safety of later use, the following construction points should be paid attention to during the erection of woodworking shed.
(1)施工前,應先編制詳細的木工加工棚施工方案,并在開(kāi)始施工時(shí)先對木工加工棚范圍內的兩側道路進(jìn)行整平、拓寬作業(yè),設置排水溝,以確保排水暢通,適應吊車(chē)站位及吊裝。
(1) Before construction, a detailed construction plan for the woodworking shed shall be prepared. At the beginning of construction, the roads on both sides of the woodworking shed shall be leveled and widened, and drainage ditches shall be set to ensure smooth drainage and adapt to the crane station and hoisting.
(2)若木工加工棚的基礎施工范圍內光纜、電力線(xiàn)眾多,還應制訂光纜、電力線(xiàn)等設備的改移方案,以及相關(guān)保護措施,以確保施工和設備。
(2) If there are many optical cables and power lines within the foundation construction scope of the woodworking processing shed, the relocation scheme of optical cables, power lines and other equipment, as well as relevant protective measures, should also be formulated to ensure construction safety and equipment safety.
(3)木工加工棚施工時(shí),其焊接作業(yè)的過(guò)程一定要注意防火,如果有風(fēng)必須設置好擋風(fēng)板,以免發(fā)生火花飛濺,造成隱患。同時(shí),木工加工棚上不得堆放雜物,以及鋼筋、模板等材料,以防發(fā)生火災。
(3) During the construction of the woodworking shed, attention must be paid to fire prevention during the welding operation. If there is wind, the wind deflector must be set up to prevent sparks from splashing and causing potential safety hazards. At the same time, no sundries, reinforcement, formwork and other materials shall be stacked on the woodworking shed to prevent fire.
木工加工棚
(4)按木工加工棚的矩型管立桿間距、排距要求進(jìn)行定位放線(xiàn),并將墊板鋪設放平穩,不得懸空。同時(shí),矩型管立桿接長(cháng)應采用對接電焊連接,立桿對接電焊焊接應交錯布置。
(4) The positioning and setting out shall be carried out according to the requirements for the spacing and row spacing of rectangular pipe poles in the woodworking shed, and the base plate shall be laid stably and shall not be suspended. At the same time, the extension of rectangular pipe upright shall be connected by butt welding, and the butt welding of upright shall be staggered.
(5)木工加工棚棚頂鋪裝施工時(shí),均應在既有線(xiàn)上方作業(yè),且須注意高空作業(yè),嚴禁任何機具和材料意外掉落損壞線(xiàn)路設備。同時(shí),應通過(guò)鋼管立柱,在木工加工棚兩側設置接地措施。
(5) When paving the roof of the woodworking shed, work above the existing line, and pay attention to the safety of working at heights. It is strictly forbidden to accidentally drop any machines and materials to damage the line equipment. Meanwhile, grounding measures shall be set on both sides of woodworking shed through steel pipe column.
此外,木工加工棚在搭設完成后,施工單位應先組織領(lǐng)導小組組長(cháng)及員、質(zhì)檢員等進(jìn)行驗收,自檢合格后報請監理單位進(jìn)行驗收,驗收合格后方可進(jìn)行使用。更多相關(guān)內容就來(lái)我們網(wǎng)站http://www.gyjywl.com咨詢(xún)吧!
In addition, after the woodworking shed is erected, the construction unit shall first organize the leader of the safety leading group, the safety officer, the quality inspector, etc. to carry out acceptance. After the self inspection is qualified, the woodworking shed shall be submitted to the supervision unit for acceptance. The woodworking shed can only be used after the acceptance is qualified. More relevant content will come to our website http://www.gyjywl.com Consult!