成人视频网站,老师洗澡时让我进去摸她那个,老汉扛起娇妻玉腿进入,强行处破女h文

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢(xún)電話(huà)
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.gyjywl.com/

地址:山東省濟南市章丘圣井工業(yè)園

工地防護欄需要如何安裝?

來(lái)源:http://www.gyjywl.com/   發(fā)布時(shí)間:2021-10-18

設備前要測量管線(xiàn)、地上處理(是置換或許夯實(shí)的情況)、基坑邊坡、開(kāi)挖、立柱暫時(shí)固定的方位、防護欄桿怎樣設備、澆注混凝土基礎、基坑圍欄緊固、調整。測繪:依據圖紙規劃要求和實(shí)踐地勢、方針進(jìn)行施工布置圖,設置立柱中 心線(xiàn),按規矩的斜度、線(xiàn)形設備護欄網(wǎng)。

Before the equipment, first measure the pipeline, ground treatment (in the case of replacement or compaction), foundation pit slope, excavation, the orientation of temporary fixing of columns, protective railing, pouring concrete foundation, fastening and adjustment of foundation pit fence. Surveying and mapping: carry out the construction layout according to the drawing planning requirements and practical terrain and guidelines, set the column centerline, and set the equipment guardrail according to the regular slope and alignment.
原始地基處理是確保護欄和整體穩定性的重要條件,為確保立柱的穩定性,需求替換和加固地基下的軟層。柱設備部分,從縱剖面上看,柱軸線(xiàn)呈直線(xiàn),不應呈現不均勻現象;從高處看,柱頂光滑,不應呈現不平的情況,特別地勢在外?;鶞屎桶拙€(xiàn)是在調查和啟航的基礎上建立的。本來(lái)的地上被填滿(mǎn)了,斜坡又被夯實(shí)了。
The original foundation treatment is an important condition to ensure the guardrail and overall stability. In order to ensure the stability of the column, it is necessary to replace and strengthen the soft layer under the foundation. For column equipment, from the longitudinal section, the column axis is a straight line and should not be uneven; From a high point of view, the top of the column is smooth and should not be uneven, especially the terrain is outside. The benchmark and white line are established on the basis of investigation and sailing. The original ground was filled and the slope was tamped again.
基坑開(kāi)挖時(shí)設備放樣方位,以確?;拥木藜?。在基坑立柱設備進(jìn)程中,有必要確保柱的穩定性和與地基的緊密連接。在立柱設備進(jìn)程中,選用小線(xiàn)段對立柱設備的直線(xiàn)進(jìn)行測驗,并對部分進(jìn)行調整,確保直線(xiàn)段,曲線(xiàn)段滑潤,立柱契合規劃圖紙要求。網(wǎng)格有必要與柱緊密連接,網(wǎng)面光滑平整,無(wú)明顯的翹曲和突起。設備護欄后,應設備立柱,以確保設備的正確性和健壯性。
During the excavation of the foundation pit, the equipment setting out direction shall ensure the size of the foundation pit. In the process of foundation pit column equipment, it is necessary to ensure the stability of the column and the close connection with the foundation. In the process of column equipment, select small segments to test the straight line of column equipment, and adjust some parts to ensure that the straight line and curve segments are smooth, and the column meets the requirements of planning drawings. The grid must be closely connected with the column, and the grid surface is smooth and flat without obvious warpage and protrusion. After the equipment guardrail, the equipment column shall be installed to ensure the correctness and robustness of the equipment.
基坑護欄只要精 確健壯的設備后才能夠有用維護施工安 全,所以設備前要做的準備工作也是尤為重要的,決不可粗心,詳細的設備進(jìn)程要看施工現場(chǎng)的實(shí)踐情況來(lái)做抉擇。
Foundation pit guardrail can effectively maintain construction safety only after accurate and robust equipment, so the preparation before equipment is also particularly important, and must not be careless. The detailed equipment process depends on the practice of the construction site.

彰武县| 金阳县| 天门市| 象州县| 鹤岗市| 靖州| 东源县| 南靖县| 五峰| 固镇县| 彰化市| 永城市| 无极县| 祁东县| 铁力市| 夏津县| 弥渡县| 承德县| 溧水县| 鄂州市| 阳山县| 南部县| 陆良县| 邛崃市| 南岸区| 丽江市| 广东省| 平和县| 阳高县| 若尔盖县| 漳平市| 东光县| 石渠县| 崇明县| 昭觉县| 徐汇区| 会东县| 遵化市| 新绛县| 沂源县| 宁德市|